Get in Touch

Lift and Elevator Wrapping Cambridge

The lift is the first thing tenants judge.

Lift car panels, doors and lobby surrounds transformed using fire-rated architectural film. Done over a weekend. Full compliance documentation included. Back in service Monday morning with no tenant disruption.

1 wknd
Most installations
10yr
Warranty
0
Days shutdown needed
Lift interior wrap using 3M DI-NOC Cambridge
Fire-rated film as standard
Out-of-hours installation available
Full compliance documentation
All 5-star Google Reviews
Cambridge and Cambridgeshire

What is lift wrapping?

The lift is the first thing tenants judge.

Scuffed stainless, peeling laminate and scratched panels tell anyone stepping in exactly what the building management thinks of the building. Lift interior wrapping transforms the car, the doors and the lobby in a weekend.

Architectural film is applied to the existing interior panels of the lift car. Nothing is removed or replaced. The film changes the surface completely. Brushed stainless, dark timber, concrete, stone. Any finish that reads as considered in a commercial environment.

The films used are fire-rated to Class B or Class 1 as required for occupied commercial buildings. Full product data sheets and certification are provided with every commercial installation. Everything needed for compliance records, ready before work starts.

Most lift wrapping projects in Cambridge are completed over a weekend. The lift is taken out of service on Friday evening and back in operation Monday morning. Tenants experience no disruption. The building manager gets a transformed common area and documentation already in order.

Velfi has worked on demanding commercial environments, including NHS buildings where fire compliance standards are non-negotiable and installation schedules are fixed. That experience means lift projects are run with the same precision as any other commercial programme.

Our work

Cambridge projects. Real results.

Lift surround wrapped
Commercial
Lift wrap · 3M DI-NOC
Commercial
Lift wrap · Installation
Commercial
Lift interior · After wrapping
Commercial
Lift wrap · Architectural film
Commercial

Common questions

What people ask before they get in touch.

For the wrapping itself, no. The film is applied to the existing panel surfaces without any structural or mechanical work. If the lift needs to be isolated, this is arranged with the building's lift maintenance contractor before Velfi attends site.
Yes. All film used in lift cars and common areas is fire-rated to Class B or Class 1 as required for the building type. Full product data sheets and fire certificates are provided with every installation.
A standard single-car lift interior is completed within a few days. With door frames and lobby surfaces included, most projects take a weekend. The lift is returned to service with no ongoing downtime.
Yes. Most building managers choose to do this at the same time. Lift doors, lobby feature walls, reception desks and entrance cladding can all be wrapped as part of a single project. One contractor, one visit, one fixed price.

Areas covered

Covering Cambridge and Cambridgeshire.

Cambridge
Ely
Soham
Newmarket
Huntingdon
St Ives
Waterbeach
Histon
Cottenham
Bar Hill
Sawston
Fulbourn
Wilburton
Littleport
Burwell
Linton
Swavesey
Cambourne
Haslingfield
Trumpington
Cherry Hinton
Milton
Impington
Girton

Commercial installation available nationwide.

Get started

A lift your tenants will not complain about.

Send photos of the lift interior and lobby. A fixed quote with specification and fire compliance details comes back within 24 hours. Weekend installation available.

Get a Free Quote Call 01223 944335